Tuesday, August 30, 2016

Team Blog Assignment #1 + Shop Maintenance Sign Up (DUE WEDNESDAY 09/07/2016)

After each sub-team creates their team blog, it will be necessary to add the following information. - Post ALL of the following information in your team blog. One post per team, not individual! Worth 10 Grade Points



Team Blog Assignment #1 will include the following:

  • Team members, with brief listing of pertinent skills
  • Team members contact information
  • Team member responsibilities within the team (who will do what) -may change throughout the semesters 
  • Proposal narrative (verbal description of what is proposed to be accomplished, which includes preliminary design requirements and deliverables)
  • Sketches or drawings
  • Critical Path Schedule using   https://gantter.com/   (Gantt chart website) -copy shareable link / screenshot of gantt chart in team blog. 
  • Budget (preliminary estimate of the cash and VIK – Value-In-Kind – needed to deliver what is being proposed)   Give an ESTIMATED RANGE for this.

Here is the link to the Shop Maintenance Google Sheets. Three individual slots per week must be filled. I put my name in there as well, since we are all responsible for cleaning up the shop!

  1. Empty all small trash cans into main trash can. Tie main trash can bags and leave in garbage bag location. Replace trash bag you just removed
  2. Picking up trash on shop floor
  3. Maintaining bathroom cleanliness (Mop if needed, wipe down toilets, remove trash, replace toilet paper / paper towels)


No comments:

Post a Comment